I have multiple shares that are backed-up weekly from one NAS to another. Recently, this has become an issue because all the backups are configured to do a full followed by 3 incremental, which means that they are all doing a full at the same time. At the moment this means they are running for 4 or 5 days continuously!!
What I would like to do is stagger the full backups so that they don't all happen at the same time.
Maybe I'm missing it, but is there a way to do that?
I'm running an RN104 which is backing-up an RN314, both running f/w 6.10.7 btw.
18 Replies
Replies have been turned off for this discussion
- SandsharkSensei
Unfortunately, there is no way to do it via the GUI. You can try creating the full backups as separate jobs and then editing /etc/cron.d/frontview-backup to change the frequency, but I don't know how that will affect the GUI. And you'd need to be comfortable with the Linux command line to implement it. Any other change via the GUI would likely undo your manual edits, so you'd have to do them again.
I think that not scheduling the full backups via the GUI and then manually creating a separate cron.d entry (/etc/cron.d/monthly-backup, as an example, though putting it in cron.weekly may be better) would likely be a better method. But I don't know if fvbackup (the executable that does the backups) will prevent that from causing multiple simultaneous backups, which could bog down a 104. But since nothing in the cron job seems to prevent that, I suspect that fvbackup is responsible for "stacking up" the backups instead of doing them simultaneously.
- StephenBGuru - Experienced User
Sandshark wrote:
You can try creating the full backups as separate jobs and then editing /etc/cron.d/frontview-backup to change the frequency, but I don't know how that will affect the GUI. And you'd need to be comfortable with the Linux command line to implement it. Any other change via the GUI would likely undo your manual edits, so you'd have to do them again.
I've done this something like this with frontview-volumeschedule, though for a different purpose (starting up maintenance tasks on days when my backup NAS were turned on, since they are on a power schedule).
You would need to examine backup_jobs.conf in order to determine the job number associated with each backup.
- daKloneAspirant
Thanks guys, much appreciated. 👍
I've also got my target NAS (the RN104) on a power schedule, so currently it switches on once a week, pulls the backups and then shuts down again (eventually!).
I'll have a look at configuring it using cron.d and no doubt come back with more questions! 😉
- StephenBGuru - Experienced User
daKlone wrote:
I have multiple shares that are backed-up weekly from one NAS to another. Recently, this has become an issue because all the backups are configured to do a full followed by 3 incremental, which means that they are all doing a full at the same time. At the moment this means they are running for 4 or 5 days continuously!!
What I would like to do is stagger the full backups so that they don't all happen at the same time.
Current settings let you specify a full backup every 2, 3, or 4 weeks. Is that what you mean?
You could change the settings to "never" for a bit, and then set some of the shares to 3 weeks. Then try setting some more back right after the first full backups resume.