M4250 resetting management port config on power cycle

Pixel_Mike
Follower

M4250 resetting management port config on power cycle

Been attempting to setup and deploy two M4250-12M2XF switches to use in a front of house rack and stage rack. However it seems that whenever the switches lose power, IPV4 management configuration ends up resetting to DHCP. Have attached screenshots of settings before and after a simple power cycle. Is there something I'm missing elsewhere in my configuration?

 

Firmware Version 13.0.4.19

 

Before power-cycle.png

After power-cycle.png

Message 1 of 1
Top Contributors
Discussion stats
  • 0 replies
  • 192 views
  • 0 kudos
  • 1 in conversation