Scheduled power-off delayed
Firmware 6.2.5 ReadyNAS 104 Firmware reinstalled There is a back job scheduled between 01:00 and 07:00 The power off is schedued for 08:00 to 00:00 (so the backup is outside of that time.) Th...
- Sep 21, 2015
Just SSH'd into the box and checked /var/log/frontview/backup there was a ststus file for an old no longer existing backup that was saying INPROGRESS. I have removed this file and restarted the NAS - I am waiting to see if it will now shutdown
MikeB666
Sep 21, 2015Tutor
Hi,
Nope the backup job finishes in usually less than 1 hour as it is just a delta of changes.
It has always finsihed well before 3am for the last few months.
So the job is completed well before the scheuled shutdown time.
This system used to work as configured for many months.
I suspect this issue was introduced in the last OS update.
MikeB666
Sep 21, 2015Tutor
Just SSH'd into the box and checked /var/log/frontview/backup there was a ststus file for an old no longer existing backup that was saying INPROGRESS. I have removed this file and restarted the NAS - I am waiting to see if it will now shutdown
- MikeB666Sep 23, 2015Tutor
Removal of status file that still had in progress - has fixed the probelm. the system now powers on, does its backup and shutdowns at the configured time.
Case Closed.