NETGEAR is aware of a growing number of phone and online scams. To learn how to stay safe click here.
Forum Discussion
Pixel_Mike
Mar 27, 2024Follower
M4250 resetting management port config on power cycle
Been attempting to setup and deploy two M4250-12M2XF switches to use in a front of house rack and stage rack. However it seems that whenever the switches lose power, IPV4 management configuration ends up resetting to DHCP. Have attached screenshots of settings before and after a simple power cycle. Is there something I'm missing elsewhere in my configuration?
Firmware Version 13.0.4.19
No RepliesBe the first to reply
Related Content
NETGEAR Academy

Master AV-over-IP networking, multicast protocols, and troubleshooting to confidently deploy and manage AV networks.
Join Us!