NETGEAR is aware of a growing number of phone and online scams. To learn how to stay safe click here.
Forum Discussion
rantech
Jun 13, 2017Aspirant
Multiple simultaneous RSYNC Jobs
I'm wondering how a 316 would react to having to different remote units trying to run remote RSYNC backup jobs into or out of the 316 at the same time. If all RSYNC jobs are initiated on the same ma...
StephenB
Jun 14, 2017Guru - Experienced User
rantech wrote:
is OS 6 smart enough to put one of the jobs on hold until it has finished responding to the other ?
No. The jobs will just run in parallel (along with any other user access).
I don't think that was the cause of your NVX failure.
- rantechJun 14, 2017Aspirant
As it turns out, I have a few different UPS units on different devices. My "expensive" pure sine wave UPS reports electrical noise and switching over to battery at the time that the NVX died. The NVX was connected to a cheaper not pure sine wave UPS in the same location and that UPS does not report any electrical problems or having switched over to battery at the time that the NVX died ... it would appear likely that electrical noise cratered the UPS ... so much for "cheap" UPS units as none of my less expensive units are reporting any of the power events that my expensive unit is reporting (4 events in the last 24 weeks) ...
Related Content
NETGEAR Academy
Boost your skills with the Netgear Academy - Get trained, certified and stay ahead with the latest Netgear technology!
Join Us!