NETGEAR is aware of a growing number of phone and online scams. To learn how to stay safe click here.
Forum Discussion
goodoletom
Dec 19, 2012Aspirant
ReadyNAS Pro Backup Status
I've started an ftp backup job that will grab data from a remote ftp server and save the data to a volume on the ReadyNasPro.
About an hour after starting the job I got the following alert:
"subject:Backup aborted for Backup Job 001 (NAS)"
"A previous run of backup job is still running. Check if that backup job has stalled, or you may need to adjust the backup interval to account for the amount of data you are backing up."
However after looking in front view it still says "in progress." Is there a way to monitor the status of file transfer and connection? I tried looking at the logs in the backup area but at the bottom of the log it says "the logs have exceeded the maximum length and have been truncated. You can access the full backup log by downloading the system logs."
About an hour after starting the job I got the following alert:
"subject:Backup aborted for Backup Job 001 (NAS)"
"A previous run of backup job is still running. Check if that backup job has stalled, or you may need to adjust the backup interval to account for the amount of data you are backing up."
However after looking in front view it still says "in progress." Is there a way to monitor the status of file transfer and connection? I tried looking at the logs in the backup area but at the bottom of the log it says "the logs have exceeded the maximum length and have been truncated. You can access the full backup log by downloading the system logs."
3 Replies
Replies have been turned off for this discussion
- john_nguyenAspirantHello,
Please get "Download all logs" from the Frontview and upload it here so we can look at the status of your ReadyNas.
John N
Agent Id: 82027
1-888-NETGEAR - chirpaLuminaryHe should be submitting the logs in a more secure manner than posting them publicly on the forum. Log files could possibly have some sensitive content in them (besides the serial number). http://www.readynas.com/kb/faq/misc/how ... d_all_logs
- goodoletomAspirantThanks for the replies! I believe the job completed successfully because 10 hours after I started the job I received a notification stating the job had finished.
However is there any way to monitor backup jobs in real time?
Related Content
NETGEAR Academy
Boost your skills with the Netgear Academy - Get trained, certified and stay ahead with the latest Netgear technology!
Join Us!