NETGEAR is aware of a growing number of phone and online scams. To learn how to stay safe click here.
Forum Discussion
Schtevo
Sep 16, 2015Aspirant
how to change order for media files DLNA
I'm using a ReadyNAS 10200 to stream music To a Samsung BD5800 with the inbuilt DLNA server. Firmware is latest version 6.5 albums are sorted in individual folders, and tracks are named 01- tr...
- Sep 16, 2015
I have confirmed that it is sorting on the ID3 Title tag in alphabetical order.
Now to retag 100GB of MP3's.......
vandermerwe
Sep 16, 2015Master
Usually the client determines the sort order, either through a user specified value or a default value specific to the device.
I don't use dlna, but what I suspect is happening is that the players are using the filenames to determine the order, rather than using the tag.
The workaround here would be to rename the files so that the track number makes up the first part of the filenames. I realise you have this already but could you try omitting the leading 0 ?
Mp3tag is arguably the best windows tagger and will rename all your files as a batch process, using the tag information that you select. Set up the "Tag to filename" function as you would like it.
If that does not work, not sure.
Schtevo
Sep 16, 2015Aspirant
Thanks vandermerwe, I don't think you are right that it is ordering on the filename - I thought my OP was clear that I had the track number as the beginning of the file name.
I'm now thinking it might be ordering alphabetically on the ID3 tag filename which doesn't have the track number on it.
Next thing to try is adding the track number to the ID3 tag filename - I haven't tried the tag tool you recommended, but I do have another one
Cheers
Schtevo.
- SchtevoSep 16, 2015Aspirant
I have confirmed that it is sorting on the ID3 Title tag in alphabetical order.
Now to retag 100GB of MP3's.......
- StephenBSep 16, 2015Guru - Experienced User
Schtevo wrote:
I have confirmed that it is sorting on the ID3 Title tag in alphabetical order.
Now to retag 100GB of MP3's.......
Definitely a pain.
Remember to use 2 digits for the prepended track number (to ensure you get 01, 02, 03 and not 1, 10, 11). Tagscanner lets you set the number of digits, not sure about other tools. FWIW it can prepend to your existing title, it doesn't need to rebuild everything from the file name.
- SchtevoSep 16, 2015Aspirant
Cheers, I'm using a program called Tag&Rename
Already had the leading zeros in the filenames so one big batch change was all I needed.
To do 100GB took just less than the time it took to play the album I used to test ;-)
Related Content
NETGEAR Academy
Boost your skills with the Netgear Academy - Get trained, certified and stay ahead with the latest Netgear technology!
Join Us!