NETGEAR is aware of a growing number of phone and online scams. To learn how to stay safe click here.

Forum Discussion

hmuessig's avatar
hmuessig
Luminary
Nov 25, 2016

Problem (Bug or Feature Lacking) with ReadyNAS Backup - Scheduling Full Backups

RN314 with 4 2TB Reds

OS 6.6.0

 

I have about a dozen shares on my ReadyNAS.

 

I use the backup feature to back them up to two external hard drives (one eSATA connected and one USB3 connected). I use rsync so that I can delete on the backup copy any original files that I delete. Some of the shares I backup as needed, others are scheduled so that a complete backup gets done once a week, and incrementals each night.

 

Since some of the shares are rather large (photogaphs and videos) I created backup jobs for the different shares on different days of the week (the only way I found after much trial and error) so that the weekly FULL backups happen on different days. It works, not elegantly, but it works.

 

UNTIL . . .  I power down the NAS when I go away for more than a day or two. When I return and boot the NAS ALL the backup jobs run at their appointed times as FULL backups and a week later they ALL run again as full backups! it is as if some "flag" gets reset or forgotten so tha the schedule I set up (by creating the backkup jobs on different days) is lost.

 

Needless to say this is a pain 'cause it takes about 27 hours to complete all the FULL backups.

 

So, the bug seems to be that the NAS forgets the backup schedule implied by setting up backup jobs on different days. The backup jobs all revert to FULL backup the first time (after powering up) and then every week.

 

The workaround is to create two backup jobs for each share with one specifying the days of the week for incremental backups and another one specifying the day of the week for the FULL backup. I've been reluctant to do this because it will double th enumber of backup jobs and a slighly-increased chance of errors. Note that this is easier now that the backup jobs are sorted/displayed in alpha order (thank you!).

 

It would be ideal if the options tab for creating a backup job included a choice for what day of the week you want to do a full backup.

 

Thank you!

 

 

 

 

 

 

 

 

4 Replies

Replies have been turned off for this discussion
  • when u set up back jobs did u tick the box "remove the contents of the backup destination before full backup"?

     

    it should be unchecked to allow readynas to do incremental backup.

     

    also 27 hours is very long. how big are the folder sizes? do u use usb3 connections at the back and usb3 external drives?

     

     

    • hmuessig's avatar
      hmuessig
      Luminary

      Yes, the "remove contents . . . " box is unchecked and all the backup jobs work as intended: a full backup one evening every week and incrementals the other six days of the week.

       

      I have about 4.5 TB of files. (And note that I'm not complaining about the time it takes to do the backups, just that the process to stagger the full backups so that they happen on different nights is a HUGE and complex process.)

       

      They get backed up to a WD 3TB USB3 external drive (NTFS) plugged into the top back USB3 port of the RN314. The other drive is a 3TB WD Black in a case with an eSATA interface. That drive is formatted EXT4 and is plugged into the back eSATA port of the RN314.

       

      For what it is worth: I switched the 3TB WD Black to EXT4 after the problems with 6.3.5(?) where backup speeds got significantly slower. It did make a difference.

       

      Thank you

       

      RN314 - 4 WD Red 2TB

      OS 6.6.0

       

       

      • StephenB's avatar
        StephenB
        Guru - Experienced User

        hmuessig wrote:

         

        For what it is worth: I switched the 3TB WD Black to EXT4 after the problems with 6.3.5(?) where backup speeds got significantly slower. It did make a difference.

         


        FWIW, the speed gap between NTFS and EXT external drives became a lot smaller when they changed their NTFS package in release 6.5. Generally I recommend that users stick with a format that they can access on another system.


        hmuessig wrote:

        the process to stagger the full backups so that they happen on different nights is a HUGE and complex process.)

          


        I agree it should be simpler.  Perhaps post an idea on the idea-exchange saying that you want the ability to schedule the dates when the full backups are done.

NETGEAR Academy

Boost your skills with the Netgear Academy - Get trained, certified and stay ahead with the latest Netgear technology! 

Join Us!

ProSupport for Business

Comprehensive support plans for maximum network uptime and business peace of mind.

 

Learn More